Concrete Construction Appliance
Project Name & Description Cone used to set the gaps on Large concrete forms
Capabilities Applied/ Processes Designing
Plastic Injection Molding
Prototyping
Equipment Used to Manufacture Part High Speed Production Tool
Material Used High Density Polyethylene
Industry for Use Construction Equipment
In Process Testing/ Inspection Performed FEA (Finite Element Analysis)
  • Optimize Molding Speed Vs. Structural Performance
Atditional Information Designed New part to retain outer shape but employed thinner wall sections for faster molding cycles but still maintained its structural performance
  • Special Design was required for the fast molding cycle and the fatigue life of the mold
Volume 20,000,000 parts/year
Delivery Location Offshore and Locally
Standards Met Customer Specification, ISO 9001:2008